Products Description of Triisopropanolamine CAS# 122-20-3
Triisopropanolamine (TIPA) is a kind of tertiary alkanolamine compound. It is widely employed as a grinding aid agent to lessen agglomeration during cement ball milling and optimize the particle size distribution of final cement products.
Parameters
| Item | Value |
| Melting point | 48-52 °C (lit.) |
| Boiling point | 190 °C/23 mmHg (lit.) |
| density | 1.0 |
| vapor pressure | 1 hPa (100 °C) |
| refractive index | 1.4200 (estimaleic-anhydride.html">mate) |
| Fp | 160 °C |
| storage temp. | Store below +30°C. |
| pka | 14.37±0.20(Predicted) |
| form | Crystalline Low Melting Solid |
| color | White to slightly yellow |
| PH | 10.8 (100g/l, H2O, 20℃) |
| explosive limit | 0.8-5.8%(V) |
| Water Solubility | Soluble |
| FreezingPoint | 52℃ |
| Sensitive | Hygroscopic |
| BRN | 1071570 |
| LogP | -0.015 at 23℃ |
| CAS DataBase Reference | 122-20-3(CAS DataBase Reference) |
| NIST Chemistry Reference | 2-Propanol, 1,1',1''-nitrilotris-(122-20-3) |
| EPA Substance Registry System | Triisopropanolamine (122-20-3) |
Safety Information
| Item | Value |
| Hazard Codes | Xi |
| Risk Statements | 36-52/53 |
| Safety Statements | 26-61 |
| RIDADR | UN 3259 8/PG 2 |
| WGK Germany | 1 |
| RTECS | UB8750000 |
| Autoignition Temperature | 275 °C |
| TSCA | Yes |
| HS Code | 2922 19 00 |
| HazardClass | 8 |
| PackingGroup | III |
| Hazardous Substances Data | 122-20-3(Hazardous Substances Data) |
| Toxicity | LD50 orally in Rabbit: 4000 mg/kg LD50 dermal Rabbit 10000 mg/kg |
Product Application of Triisopropanolamine CAS# 122-20-3
Triisopropanolamine serves as a versatile amine for numerous industrial uses. It functions as an emulsifier, stabilizer and chemical intermediate. In addition, it can neutralize acidic ingredients in certain herbicides. Its primary application lies in cement production as a grinding auxiliary to reduce agglomeration and improve particle distribution of finished cement products.
Factory and Equipment Show
Fast delivery time
Inventory: 2–3 working days
New production: 7–10 working days
